New battery hold down/heat shield after fresh paint
New starter installed
Carter AFB carb. re-installed with new/correct gaskets
Accelerator linkage re-attached
Overflow tank reinstalled w/new hoses
Preparing for new cork valve cover gaskets
We cleaned up the aluminum valve covers
Getting ready to install new spark plugs/double checked gaps
Installed a new GF-90 fuel filter
Fuel filter installed, fuel lines being reattached
Laid out the new brake drums/brake kits/wheel cylinders for all 4 wheels...
Removing the old wheel cylinder...
New wheel cylinder (front) and new brake hoses
Wire brushing the backing plate contact surfaces and added grease
Front driver side complete
Front driver side: new drum
Rear driver side complete
Re-installing the wheels